NEWS

News

2x800tpd PFR Twin-shaft lime kiln Contract Signing Ceremony

2x800tpd PFR Contract Signing Ceremony


Aug 7, 2024, Mr. Han Haizhao, Chairman of Dingzheng Group, met with distinguished customers from middle Asia in the conference room of the Group’s Headquater for 2x800TPD Twin-shaft PFR contract signing ceremony. The meeting is presided by Mr. Kaye—Oversea Business Director who accompanied the customers to come and exchange technology with the chairman of Mr. Han Haizhao and the engineer Mr. Li. and Mr. Cong. At the meeting, both sides actively shared their experience and technical achievements, and the futhur cooperation in Lime section and Metallurgical section, and felt very happy.
2x800tpd PFR Twin-shaft lime kiln Contract Signing Ceremony

2x800tpd PFR Twin-shaft lime kiln Contract Signing Ceremony
Mr. Kaye, led customers to visit the company manufacture workshop and Equipments. The customer spoke highly of the company’s production scale and technical level, and expressed their willingness to strengthen cooperation with the company in the future.

2x800tpd PFR Twin-shaft lime kiln Contract Signing Ceremony

2x800tpd PFR Twin-shaft lime kiln Contract Signing Ceremony


This technical exchange will build a bridge for the cooperation and development of the two sides. And we both believe MER can contribute to a better Middle Asia projects in the near future, including lime kiln, metal magnesium plant, TG type pellet plant, belt pellet plant, Midrex DRI, Hismelt DRI, Ductile Iron Pipe plant, and FGD...metallurgical and building material equipments.

2x800tpd PFR Twin-shaft lime kiln Contract Signing Ceremony

2x800tpd PFR Twin-shaft lime kiln Contract Signing Ceremony